It took us 15 years to complete construction of the number 3 line, since the population was growing all the time and new needs were continually arising. Today, the green line runs over 22,907 kilometers from north to south, from Indios Verdes to Universidad. It has 21 stations: 2 terminals, 6 with transfer points and 13 through stations. The Indios Verdes station is a notable feature of this line, one of the largest terminals in the system: a 150 by 40-meter lobby which was at the time it was built the first in the metro system with two platforms and three tracks that allowed for the operation of new autopilot equipment.

Client:

Mexico City Traffic and Urban Transport Commission

Location:

Mexico City

Construction start date:

1968

Completion date:

1983